Level 1 Progress

For some reason I can't sleep right now, and after browsing a few Ravelry pages I figured I may as well update my Level 1 progress. I was hoping to get the whole thing finished by the end of this month, which will be a little tight, but if I tell the world, that will help me stick to the timetable, right? Maybe?

I have the blocking report almost done, just proof-reading to go. I'm not worrying about the details too much on this one, it's probably not my finest writing but I figure if all the useful information is there, that's the important thing.

I have knitted and blocked the hat, just need to sew on the i-cord loops. I've knitted all the swatches, and blocked all but two. Except for, someone on Ravelry asked about doing traditional versus modified SSK decreases, and the answer was to do the traditional method (the one where you slip both as if to knit, whereas I usually slip the second stitch as if to purl), so I'll have to reknit that swatch.

The major remaining items are to write up the cable pattern, answer all the questions, and fill in the tags for each swatch with the pattern information. In theory it's doable by the end of the month, let's see if I actually manage it. Getting over my insomnia would help.

Leave a Reply

Your email address will not be published.